The Water Treatment Plant capacity is currently 12.44 MGD as permitted by the Georgia Environmental Protection Division. Current demand on the Plant is 5.00 MGD with excess capacity of 7.44 MGD.
The Wastewater Treatment Plant capacity is 10.50 MGD as permitted by the Georgia Environmental Protection Division. Current load on the Plant is 4.00 MGD with excess capacity of 6.50 MGD.